Skip to Content

PTSC MC & North Oil and Gas Company

May 9, 2026 by
PTSC MC & North Oil and Gas Company
Đỗ Mạnh Duy
| No comments yet

Digitalization of the PTSC M&C drilling rig: Optimizing remote operations using 3D/360 technology, helping to reduce equipment lookup time and maximize offshore training logistics costs!

Implementation:

  • Digitalizing the structure of the drilling rig, equipment areas, piping systems, and operational spaces using 3D/360 technology.

  • Integrating asset management and maintenance information modules to support technical operations.

  • Linking technical documents and drawings with a 3D interface.

  • Optimizing the model to support remote operations, check equipment status, and train personnel.

Results:

  • Helping the operations team quickly grasp the current status of the drilling rig, supporting maintenance and repairs more accurately.

  • Reducing the time to look up equipment information and minimizing errors during field operations.

  • Supporting the training of new personnel without the need to deploy offshore, saving logistics costs and personnel arrangement time.

  • Building a shared platform for multiple departments such as operations, engineering, safety, and training.

Project experience at:

https://platform.starglobal3d.com/smart-facility-360/kho-bai-ha-tang-ptscmc/

Share this post
Tags
Sign in to leave a comment